Spotlight Project    

 Company Portfolio

 

 

Project Specifics: Westfield Mall

Location: Sherman Oaks, CA

 

Film Type: Huper Optik Neutral 25 Exterior

 

Completion Time: 3 Weeks

 

Scope: Removal of existing film and replacement of new film. Just over 15,000 sq ft. Extremely difficult application to peaked skylights. Created rolling ladder systems to allow safe access for crew to film and edge seal all windows.

 

Clients Needs: Existing film was over 10 years old and was in really bad shape. With the advancement of longer lasting exterior products, Xlnt Tint came in and replaced all existing film to reduce the massive heat load the mall takes from a roof of all glass.

 

.
 

 Customer Comments:

"Mike and the crew did a great job in replacing the old peeling film that was really looking bad from our patrons view. The added benefit of greater heat rejection and overall glare control was a great feature as well. Great job."

 

Home About Us  |  Contact | Shop Locator  |  Why Xlnt Tint  


Copyright 1988 - 2012 Xlnt Tint of Anaheim, Inc. and Xlnt Tint of Mid Atlantic, Inc.

All images, text, and files are property of Xlnt Tint and may not be downloaded without permission from Xlnt Tint,

 

 

Follow Us

FacebookTwitter

Huper Optiks   Energy Star   USGBC        BBB Accredited Business